New Karolina Ostrava
The order includes the provision of the complete infrastructure for the newly-built Ostrava quarter, the area of which in the planned future built-up zone approaches 20 ha. A complete network of new sewage and rainfall drainage systems will be built within this area as part of construction stage I, as well as new distributions of water line feeders, connections for the buildings, and the connection to the electricity distribution network.
The preparation and infrastructure will be built for the future tram and trolley tracks in a way that ensures the newly-built ground adaptations of the terrain are not impaired in the process of the introduction.
The order furthermore includes the complete implementation of solidified areas around the future buildings of the shopping centre, around the administrative building and also the residential building. Adaptations of the grounds of the central square in front of the historical double hall will be achieved next, and the stage will terminate with final terrain and park adaptations.